Important Update – TB Twin Tunnel Project - 10th June, 2025
With reference to today’s meeting with Hon. Deputy Chief Minister Shri Eknath ji Shinde, Hon. MP Shri Naresh Mhaske, MMRDA Commissioner and TMC Commissioner, we are happy to inform all residents that key demands raised by Mulla Baug Project Affected People (PAP)—represented by societies of Cosmos Lounge, Neelkanth Greens, Neelkanth Woods, The Verraton, and Shree Satya Shankar—have been accepted:
- The tunnel approach road will be underground till Shree Satya Shankar.
- Muck disposal will use a conveyor belt till Uniabex- no dumpers will enter Mulla Baug road.
- EPM (Environmental Protection Measures) norms will be followed strictly, and sound barriers will be installed on both sides of Mulla Baug road.
- A dedicated SPOC from MMRDA will be deputed to oversee execution and coordination.
🙏 Special thanks to Mr. Rakeshji for facilitating the high-level meeting with DCM, MP, and MMRDA.
👏 Gratitude to the entire PAP team, PAP core committee for their constant support and efforts.
💪 Thanks to the core committee members who participated in today’s marathon meeting.
Nitin Singh
On behalf of PAP Core Committee
Chairman, Cosmos Lounge
______
Click here to view the pictures of the meeting.
(Superb work, residents!! The power of hard work and right help can take one a very long way! A year long fight has been fruitful. Now, we wait for the MMRDA officials to update us with the revised plan and PPT).
No comments:
Post a Comment