Wednesday, November 6, 2024

✉️ Letter to Mr. Mudgal (MMRDA) 06-11-2024

Click here to see the letter submitted to Mr Mudgal's office subsequent to 5 other letters, and we hope to get a meeting by the end of November after election results.


Sunday, November 3, 2024

✉️ Letter To Mr. Raj Thackeray : 03-11-2024

Click here to read the letter sent to Mr. Raj Thackeray representing the concerns of residents affected by the Thane-Borivali Tunnel Project. 


Thursday, October 10, 2024

✉️ Appeal filed against the RTI reply from MMRDA : 10 - 10 - 2024

Click here to read the appeal filed by Neelkanth Greens against the MMRDA's insufficient response to the RTI filed in April of 24. 

Tuesday, September 3, 2024

✉️ Letter to TMC and DCP: 03-09-2024

Click here to read the Letter sent to TMC and DCP Traffic


Message by Mr. Tarak Modi - 

As per point no.10 of the summary of what transpired in the meeting last Sunday, our TMC Commissioner has been made aware of our specific concerns. Our CM as well as our MP is looking into the issue. As explained in meeting (which several missed attending) technical evaluation of our suggestions is under progress in MMRDA. 
Core committee will take up matter with all the offices mentioned after Ganpati festival. 
Also please rest assured honorable chief minister has taken note of this matter and is also working on it but until and unless a technical evaluation and detailed solution is available he also would not be enough position to give us any commitment.


Sunday, September 1, 2024

👥 Residents Meet at Neelkanth Woods: 01-09-2024

Time: 6.30 PM 

Venue: Verraton Club, Neelkanth Woods

Message by Mr. Sharad Varaskar - 

A meeting of all the project affected residents was held to apprise about the efforts taken till date by the core team in respect of the Tunnel related issues and the present status of discussion with the authorities and to decide upon future course of action. 

Given that the Ganesh festival starts early next week, this meeting was called on a short notice. Click here to see the list of attendees for the meeting.

The summary is as follows:
  1. The Thane Borivali link alignment cannot be changed.
  2. It was explained how the present traffic Road circulation plan of MMRDA does not separate the Thane Borivali bound traffic and the local traffic at different levels. Hence, MMRDA has been requested to re-assess the said traffic circulation plan. 
  3. MMRDA has engaged a consultant to reassess the traffic circulation plan. 
  4. The present traffic circulation plan is "at grade" and doesn't address the issues of pedestrian and local vehicular traffic crossing. 
  5. We have requested MMRDA to consider Thane Borivali traffic to be taken totally underground. In case of any feasibility issue, second option is to take it elevated. 
  6. Other issues like  noise, air, dust pollution on the road due to excavated muck hauling etc will be taken care of as per the approved Environment Management Plan (EMP).
  7. Toll plaza issue is also proposed to be addressed with automated toll collection system.
  8.  A core team has been formed to represent on behalf of all the Project Affected People.
  9. It's time now to form an officially registered association to take the matter ahead with the concerned authorities.
  10. We are also taking help of our hon MP, TMC Commissioner and hon CM to address our issues. 
  11. The one and only focal point issue, which is of prime importance,  is request for "grade separation" in the traffic circulation plan. Request all to be united on this and everyone present for the meeting have unanimously agreed to this.
  12. Request all residents to not to make individual representations and complaints in tunnel related matters with government authorities as this diverts our prime issue.
  13. It was decided to seek media attention as and when required.
  14. The core team is moving ahead with a very positive mindset and an optimistic approach. Hence, messages with negativity, pessimism and misinformation on group should be scupolously avoided.
  15. If any resident has a suggestion or any value addition, can get in touch with any of the core team members


Sunday, August 25, 2024

Wednesday, August 14, 2024

Monday, August 5, 2024

Tuesday, July 30, 2024

✉️ Letter from MEIL to Neelkanth Woods: 30-07-2024

Click here to read the letter from MEIL to Neelkanth Woods seeking NOC for demolition and restoration of compound wall

Tuesday, July 23, 2024

✉️ Letter from MP Naresh Mhaske to MMRDA: 23 - 07 -2024

Click here to read the letter sent to MMRDA by MP Naresh Mhaske on 23 - 07 - 2024. 

It received acknowledgement on 25 - 07 - 2024.

✉️ Letter from MP Naresh Mhaske to CM Eknath Shinde : 23-07-2024

 Click here to read the letter sent by MP Naresh Mhaske to CM Eknath Shinde on 23 - 07  - 2024 and received acknowledgement on 24 - 07 - 2024. 


Friday, July 19, 2024

✉️ Letter to MP Naresh Mhaske: 19-07-2024

The letter was sent to MP Naresh Mhaske on 19 - 07 -2024. 

Received acknowledgement on  06 - 08 - 2024

Click here to read the acknowledged letter to MP Naresh Mhaske representing the concerns of residents to the Tunnel Project

✉️ Letter to CM Eknath Shinde : 19-07-2024

The letter was sent to CM Eknath Shinde on 19-07-2024. 

It received acknowledgement on 30-07-2024

Click here to read the acknowledged letter sent to CM Eknath Shinde. 

Wednesday, July 10, 2024

✉️ Letter from MEIL to Neelkanth Woods: 10-07-2024

Click here to read the letter from MEIL to Neelkanth Woods requesting permission for TOPO survery within 15m from Society Gate

Saturday, June 15, 2024

✉️ Letter to MMRDA Executive Engineer: 15-06-2024

Click here to read the letter to Executive Engineer MMRDA requesting stopping of work till installation of effective sound barriers 

Sunday, May 12, 2024

✉️ Letter to CM Eknath Shinde: 12-05-2024

Click here to read the letter to CM Shri Eknathji Shinde for presenting the concerns about the tunnel project recieved acknowledgement on 14 - 05 - 2024

Find the original submitted letter here.

Wednesday, May 8, 2024

✉️ Letter to MMRDA + Minutes of the Meeting : 08-05-2024

Click here to read the 1st letter sent to MMRDA submitting the minutes of meeting (MoM) held on 6th May 2024 to voice concerns about the tunnel project

Wednesday, April 3, 2024